ATCO Group – East & West Factory: Factory Roof & Gutter Waterproofing in Dammam

Valley gutters, ventilators and HVAC-platform junctions waterproofed across ATCO's East & West factories.

Dammam, Saudi ArabiaManufacturingEPDM system
Get a free survey for your roof
ATCO Group – East & West Factory factory roof & gutter waterproofing in Dammam - ETCE EPDM work, photo 1 of 4 ATCO Group – East & West Factory – Dammam

Project photos

Tap any photo to enlarge. All photos were taken on site by the ETCE team.

The challenge

ATCO's East and West factories share the classic weak points of a large industrial roof: long valley gutters that collect every drop from two slopes, turbine ventilators, and rooftop HVAC platforms where the roof meets a raised structure. These junctions are hard to keep sealed with sealant alone because the metal moves every day in the heat.

What ETCE did

ETCE lined the valley gutters with continuous EPDM, turned up onto the sheets on both sides so water can no longer back up under the laps. Ventilator bases were flashed with EPDM, and the junction around the HVAC platform, where the roof meets the steel upstand, was sealed with a wide EPDM detail. All work at height followed ETCE's HSE procedures around the platform guardrails.

Failure points treated on this roof

Materials & method

  • EPDM membrane (1.2 mm) cut to width for each detail: UV-stable and flexible at Gulf roof temperatures.
  • Promax Bonding Adhesive, rated for surface temperatures up to 120°C, for a permanent bond to the metal sheets.
  • Preparation first: old coatings, failed sealant and loose rust removed so the membrane bonds to sound metal.
  • Roof-side, zone-by-zone execution so the building below keeps operating with no shutdown.
  • Working-at-height HSE: trained crews, full PPE and safety lifelines on every roof.

The result

Both factories now have gutters and junctions that can handle heavy rain and daily thermal movement. The work is carried out from the roof surface, zone by zone, which is how ETCE avoids shutting down production.

Seeing leaks like this at your factory in Dammam?

Send us a few details and an ETCE engineer will call you within 24 hours to arrange a free roof survey. You get a written report with photos of every failure point and an itemised quotation, with no obligation.

Project facts

  • ClientATCO Group – East & West Factory
  • LocationDammam, Saudi Arabia
  • SectorManufacturing
  • RoofMetal roofs with valley gutters and rooftop HVAC platforms
  • Failure points treated
    GuttersWall junctionsVentilatorsEnd laps
  • SystemEPDM membrane + Promax Bonding Adhesive
  • WarrantyUp to 15 years on ETCE EPDM systems

Free roof survey

Leaking roof? An engineer calls you within 24 hours.

Your details are only used to contact you about your roof.

More projects like this

B&R Gulf metal roof & gutter waterproofing in Dammam - ETCE EPDM work, photo 1 of 3Dammam
Industrial

B&R Gulf

Parapet gutters, the ridge line, laps and fasteners sealed across a long-span roof, then water-tested.

GuttersWall junctionsRidge lineEnd laps
View project
SASIB metal roof waterproofing in Dammam - ETCE EPDM work, photo 1 of 3Dammam
Industrial

SASIB

Exhaust hoods, gooseneck vents, parapet junctions and laps waterproofed with EPDM.

Hoods & curbsPipesWall junctionsVentilators
View project