HomeSolutionsChimneys, Ducts & Exhaust Stacks

Chimney, Duct & Exhaust Stack Waterproofing for Metal Roofs in Saudi Arabia

Chimneys, ventilation ducts and exhaust stacks are among the hardest points on an industrial metal roof to keep watertight. ETCE seals them with a fully bonded EPDM wrap that copes with heat, vibration and awkward shapes, and we work from the roof so your plant or kitchen keeps running.

Across Saudi ArabiaUp to 15-year warrantyFree roof survey
Get a free roof survey
Chimney, Duct & Exhaust Stack Waterproofing for Metal Roofs in Saudi Arabia - Lulu Hypermarket, Bahrain Lulu Hypermarket – Bahrain

Why leaks start around chimneys and ducts

A stack passing through a metal roof is attacked from three directions at once. The flue or duct runs hot, the fan or process equipment makes it vibrate, and its outline rarely matches the profile of the sheeting around it. Sealant beads and cut-to-fit metal collars are rigid, so after a few summers of heating, cooling and shaking they crack or pull away, leaving a gap exactly where rain collects.

In the Eastern Province the problem is made worse by humid, salty air. Water that sits around the base of a duct in Dammam, Jubail or Al Khobar turns into rust on the upstand and the surrounding sheets, and every Shamal-driven shower pushes more water sideways into the opening. Sealing the joint properly also stops that standing water, so it protects the steel as well as the building below.

Warning signs at your roof penetrations

  • Drips or stains on the ceiling or insulation around a flue, extractor or duct
  • Cracked, hardened or missing sealant at the base of the stack
  • Rust streaks on the upstand or the roof sheets next to it
  • Water pooling on the uphill side of a wide duct after rain
  • A metal collar that has been re-sealed several times and still leaks
  • Loose or rattling flashing around vibrating exhaust fans

How ETCE seals a chimney or duct penetration

  1. Survey and heat checkOur engineer inspects each stack, notes its shape and operating temperature, and records it with photos in the written survey report.
  2. Strip and cleanFailed sealant, loose collars and debris are removed, and the steel around the opening is cleaned back so the adhesive bonds to a sound surface.
  3. Cut EPDM to the shape1.2 mm EPDM is cut to suit the stack and the roof profile around it, whether the duct is round, square or irregular.
  4. Wrap all four sidesThe membrane is bonded with Promax Bonding Adhesive up the stack and out onto the sheeting on every side, leaving no gap for water to enter or stand.
  5. Final inspectionEach wrapped penetration is checked for full adhesion and photographed before the zone is handed back.

Materials & workmanship

  • 1.2 mm EPDM membrane that stays flexible under vibration and UV exposure
  • Promax Bonding Adhesive, rated for surface temperatures up to 120 °C
  • Stacks running hotter than 120 °C receive a newly fabricated flashing instead
  • Up to 15-year warranty on the EPDM system, with a 24–48 hour after-sales response

Photos from ETCE projects

Site photos from ETCE projects in Saudi Arabia and Bahrain. Tap to enlarge.

Frequently asked questions

What happens if my chimney runs hotter than 120 °C?

The EPDM system is designed for surface temperatures up to 120 °C. If our survey finds a flue that runs hotter, we will not wrap it. Instead we propose a newly fabricated flashing suited to that heat and explain the choice in the written report.

Will fan vibration break the new seal?

EPDM is a rubber membrane, so it flexes with the duct instead of cracking the way rigid sealant does. Because it is bonded across its whole contact area rather than relying on a single bead, small movements are spread out and the seal stays intact.

Do we have to shut down the kitchen, oven line or exhaust system?

ETCE works from the roof, zone by zone, so the building normally keeps operating. For a stack that runs hot in service, our engineer agrees a suitable working window with your maintenance team during the survey.

Can you treat square ducts and clusters of pipes as well as round flues?

Yes. Because the membrane is cut to fit each detail on site, it can be formed around rectangular ducts, round flues and irregular groups of penetrations. Smaller pipes and cable entries are covered on our pipe penetration page.

Stop the leak around your stack

Book a free roof survey and our engineer will photograph every chimney and duct penetration and send an itemised quotation. Call or WhatsApp +966 54 352 0904.

Why facility managers choose ETCE

  • Free survey with a written, photo-documented report
  • Up to 15-year warranty on EPDM systems
  • Work carried out roof-side, with no shutdown
  • 24–48 hour after-sales response
  • Head office in Dammam, serving all of KSA

Free roof survey

Leaking roof? An engineer calls you within 24 hours.

Your details are only used to contact you about your roof.

Projects where ETCE treated this

BFIM factory roof waterproofing in Dammam - ETCE EPDM work, photo 1 of 3Dammam
Manufacturing

BFIM

Exhaust-stack penetrations, rusted sheets and ridge lines waterproofed with EPDM on a live factory roof.

Stacks & ductsRustRidge lineEnd laps
View project