HomeProjectsAdhwa Al Rawafid

Adhwa Al Rawafid Electric Industries: Metal Roof Waterproofing in Dammam

End laps, rusted screw heads and steel support penetrations sealed with EPDM on a working electrical factory.

Dammam, Saudi ArabiaElectrical manufacturingEPDM system
Get a free survey for your roof
Adhwa Al Rawafid Electric Industries metal roof waterproofing in Dammam - ETCE EPDM work, photo 1 of 3 Adhwa Al Rawafid Electric Industries – Dammam

Project photos

Tap any photo to enlarge. All photos were taken on site by the ETCE team.

The challenge

The factory roof at Adhwa Al Rawafid carries a steel framework for rooftop equipment, and every bracket that passes through the sheeting is a potential leak path. The survey found rust forming around the screw heads, fixings that had worked loose under daily heat cycling, and open end laps across the roof slope. With electrical production and stock underneath, even a small drip was a risk the client could not accept.

What ETCE did

ETCE treated the roof point by point instead of coating it blindly. Each steel support and bracket base was cleaned back to sound metal and wrapped with an EPDM flashing bonded to the sheet profile. Rusted and loose screws were tightened or replaced and every screw head was sealed individually, and the horizontal end laps were closed with continuous EPDM strips.

Failure points treated on this roof

Materials & method

  • EPDM membrane (1.2 mm) cut to width for each detail: UV-stable and flexible at Gulf roof temperatures.
  • Promax Bonding Adhesive, rated for surface temperatures up to 120°C, for a permanent bond to the metal sheets.
  • Preparation first: old coatings, failed sealant and loose rust removed so the membrane bonds to sound metal.
  • Roof-side, zone-by-zone execution so the building below keeps operating with no shutdown.
  • Working-at-height HSE: trained crews, full PPE and safety lifelines on every roof.

The result

The support penetrations, fastener rows and laps are now sealed with a UV-stable membrane that moves with the roof instead of cracking. The client has a documented, walkable roof that can be inspected and maintained without disturbing the waterproofing.

Seeing leaks like this at your electrical products factory in Dammam?

Send us a few details and an ETCE engineer will call you within 24 hours to arrange a free roof survey. You get a written report with photos of every failure point and an itemised quotation, with no obligation.

Project facts

  • ClientAdhwa Al Rawafid Electric Industries
  • LocationDammam, Saudi Arabia
  • SectorElectrical manufacturing
  • RoofSingle-skin corrugated metal roof with rooftop steel supports
  • Failure points treated
    SupportsScrew headsEnd lapsRust
  • SystemEPDM membrane + Promax Bonding Adhesive
  • WarrantyUp to 15 years on ETCE EPDM systems

Free roof survey

Leaking roof? An engineer calls you within 24 hours.

Your details are only used to contact you about your roof.

More projects like this

B&R Gulf metal roof & gutter waterproofing in Dammam - ETCE EPDM work, photo 1 of 3Dammam
Industrial

B&R Gulf

Parapet gutters, the ridge line, laps and fasteners sealed across a long-span roof, then water-tested.

GuttersWall junctionsRidge lineEnd laps
View project